Multi-arm tunneling drilling rig is designed to support demanding underground excavation work with a practical and coordinated structure. As a professional Roadheader for underground mining, it combines powerful drilling capability, flexible arm movement, and stable operation to help improve efficiency in complex working environments. The multi-arm configuration allows operators to handle different drilling positions while maintaining a more organized workflow.
Built for challenging tunneling applications, the rig focuses on structural durability, operational flexibility, and convenient maintenance. Its design can adapt to mining tunnels and other underground projects where working space, rock conditions, and equipment mobility require careful consideration. The integrated system helps connect drilling, positioning, and machine movement into a more efficient excavation process.
For contractors and project operators, equipment selection should always consider actual geological conditions, tunnel requirements, transportation arrangements, and maintenance needs. This Multi-arm tunneling drilling rig can be evaluated according to specific project applications, with professional support available for product selection and customization. Contact the supplier to learn more about the Roadheader for underground mining and discuss a suitable solution for your project.
The large-scale tunneling drilling rig adopts a modular design, making it easy to transport and relocate. It is suitable for tunneling operations in fields such as medium- and large-scale mining, highway and railway construction, water conservancy and hydropower projects, and defense tunnel construction.
External dimensions


| Model | A(mm) | B(mm) | C(mm) | D(°) | E(°) | F(mm) | G(mm) | H(mm) | I (mm) |
| CY-T313C | 15697 | 3810 | 442 | 16 | 16 | 2600 | 3500 | 900 | 2200 |
| Model | J(mm) | K(mm) | L(mm) | M(°) | N(°) | P(mm) | Q (mm) | S(mm) | T(mm) |
| CY-T313C | 500 | 3134 | 8500 | 4000 | 40 | 10000 | 7800 | 4200 | 3500 |
Performance parameters
| Project | Unit | Numerical value | ||
| Slotting | Excavation (Composite Beam) | |||
| Job Parameters | Soldering tip | / | T60 | R38/T38 |
| Aperture | mm | 127~180 | 38~64 | |
| Maximum impact power | kW | 35 | 18 | |
| Maximum Torque | N.m | 2285 | 1050 | |
| Rock drill parameters | Total length | mm | 5310 | 4910 |
| Drilling depth | mm | 6300 | 6000 | |
| Propulsive force | kN | 20 | 15 | |
| Walking parameters | Promote compensation | mm | 1800 | |
| Advance beam flip | ° | 360 | ||
| Drill arm pitch | ° | -25/55 | ||
| Power parameters | Diesel engine power | kW | 96 | |
| Departure angle | ° | 16 | ||
| Approach angle | ° | 16 | ||
| Maximum climbing ability | ° | 14 | ||
| Walking speed | km/h | 3.7 | ||
| Project | Unit | Numerical value | |
| Slotting Excavation (Composite Beam) | |||
| Electrical System | Host power | kW | 55/75 |
| Voltage | V | 1000 | |
| Frequency | Hertz | 50 | |
| Hydraulic system | Maximum system pressure | bar | 250 |
| Hydraulic oil tank volume | L | 480 | |
| Filtration accuracy | micrometer | 10 | |
| Water supply system | Motor power | kW | 7.5 |
| Maximum flow | L/min | 400 | |
| Gas supply system | Rated power | kW | 11 |
| Maximum flow | L/min | 1970 | |
Technical Features
| Deep single-drilling depth | Wide scope of work | Coordinated operations for slotting and rock drilling |
| Adopting a composite extended-propeller design, the drilling blast holes can reach a depth of up to 6 meters. | Adopting a dual-propeller design, it provides wide coverage for rock excavation. | Three arms with independent control enable simultaneous and coordinated operations for slotting and tunneling. |
Keywords:
CUTTING TUNNEL JUMBOCY-T313C
Roadheader for underground mining china
Previous:
Next:
Multi-arm tunneling drilling rig
Contact Information
Category:








