Overhead drilling rig knowledge: In mine construction, these matters concerning material transport should be noted.

2018-07-10

Miners should also know that during the coal mine construction using shaft drilling rigs and reverse-circulation drilling rigs, many unstable situations may exist. Therefore, to ensure safety, extra care must be taken when using shaft drilling rigs and reverse-circulation drilling rigs. Of course, transportation of materials cannot be careless. Chuangyuan High-tech's editor believes that only by adopting appropriate protective measures can the overall orderly and normal progress of mine construction be ensured.

 

 Hunan Chuangyuan High-tech Machinery Co., Ltd.

 

1. Before and after the construction of the shaft drilling rig, when transporting materials using the transporter, the coal cutter must be locked, and all stop and start signal devices installed on the conveyor must be intact, the spacing must meet the regulations (15 meters), and must be sensitive and reliable.

 

 Hunan Chuangyuan High-tech Machinery Co., Ltd.

 

2. Before transportation, all personnel involved in transportation, especially the transporter driver, must understand the type, quantity, and delivery location of the materials. Chuangyuan High-tech's editor must mention: It is necessary to understand the parking position of the coal cutter, check the condition of the conveyor, and ensure that the conveyor is "flat, straight, and stable," without obvious deviation, sharp bends, steep bends, or obvious gaps in the chute that affect the operation and sliding of materials. If any hidden dangers are found and not handled properly, material transportation is strictly prohibited.

 

 Hunan Chuangyuan High-tech Machinery Co., Ltd.

 

3. During material transportation, assign a dedicated person to monitor the material transportation situation. Assign dedicated personnel to supervise the signal devices, material unloading locations, and coal cutter parking positions. In addition, a dedicated person must monitor the transporter lock button, and there should also be personnel monitoring 10 meters behind the transported materials. In case of abnormal situations such as wedging, issue a signal and stop immediately for processing. In addition, ensure that the shaft drilling rig and reverse-circulation drilling rig can stop operation to ensure safety.

 

4. All personnel involved in material transportation at the working face must concentrate their attention, constantly observe the material operation, and stop immediately for processing if any abnormality is found. The conveyor driver must concentrate, keep their hands on the operating buttons, and pay attention to the start/stop signals and the operation of the transporter from the other party at all times. The transporter must start and stop promptly.

 

Quality wins, innovation leads to a distant future. Today's sharing of shaft drilling rig knowledge from Chuangyuan High-tech's editor ends here. If you have better suggestions for mine construction, you can also leave a comment.