Zijin Group hard rock 2-meter diameter construction

2025-04-17

Project Location

Xinjiang, Jinshan Mining and Metallurgy Iron Mine

Date

2022.07-2022.09

Model

R120VD

Well Depth

50 meters, 6 in total

Diameter

2 meters

Rock Hardness

F14-16

Operation Time

Pilot hole and reaming: 66 days

 

 

 

Construction Site

Pilot hole breakthrough

2-meter diameter reaming breakthrough